Data center infrared & arc flash Find the hot spot. Keep the nines.

Level III infrared thermography, PE-stamped arc flash studies and NFPA 70B programs for data centers and mission-critical facilities. Energized gear, scanned under your MOP, with no outage.

An InfraredTeam company · Infrared since 1996

Of infrared thermography
30 yrs1
Of critical capacity scanned annually
1+ GW2
Components scanned
500,000+3
Infrared inspections
10,000+4
States scanned
45+5
  1. 1InfraredTeam founded in 1996. In data centers since 2009.
  2. 2Published design capacity of the data center campuses we scan each year, including planned phases. Not measured load.
  3. 3Estimate across InfraredTeam, all facility types: inspections × average components per inspection.
  4. 4Inspections performed by InfraredTeam since 1996, all facility types.
  5. 5States with at least one of our inspections, all facility types.

Why “Nines”

99.999% uptime is about five minutes of downtime a year. We help protect it, by finding the failing connection before it becomes the outage.

About the name

Inside facilities run by the biggest names in data centers

  • Equinix
  • Digital Realty
  • Compass Datacenters
  • Aligned Data Centers
  • NTT Global Data Centers
  • Flexential
  • TierPoint
  • DataBank
  • Verizon
  • T-Mobile
  • AT&T
  • ExxonMobil
  • FIS
  • Fiserv

Work performed directly and through electrical contractor partners. Logos are trademarks of their owners, shown to describe experience, not to imply endorsement.

Why infrared

Electrical failures show up as heat long before they show up as outages.

A loose lug, an overloaded breaker or a failing fuse clip runs hot for weeks or months before it trips, arcs or burns. An infrared camera sees that heat through the gear while it carries load. Finding it on a scheduled visit costs a work order. Finding it in an outage costs the nines.

Infrared image of a PDU panel with one overloaded 20 amp branch breaker glowing white-hot PDU PANEL · 20A BREAKER AT 17A · 131°F · CLASS 3
  • 01

    It sees what a walk-through can't

    Heat from a failing connection is invisible to the eye and to most monitoring until it is far along.

  • 02

    It's now the standard

    NFPA 70B is a required standard, not just guidance. The 2026 edition calls for infrared at least every 12 months and sets deadlines for repairs.

  • 03

    It's the record you'll be asked for

    Insurers, auditors and customers increasingly ask for the report, not just the work order.

The critical power path

Nine stops between the utility and the rack. We scan all nine.

A failure anywhere on the path can take down what is downstream of it. Point at any stop to look through our camera, then open it to see the full scan from one of our reports.

01 / 09 · Utility

Medium-voltage switchgear

Where utility power enters the building. A failure here sends the whole site to generator.

What we look for
Bus joints, cable terminations, breaker stabs and the heat pattern of each section under load.
From our reports Class 1 · Normal
Main bus and section connections within a few degrees of each other. Logged as the baseline we trend against next year.

02 / 09 · Backup

Generators

They only matter on the worst day, which is why they get missed the rest of the year.

What we look for
Output breakers, alternator terminations and control wiring, scanned during a load-bank or monthly run.
From our reports Class 2 · As time permits
Two 30A breakers in a generator-pit panel carrying 20.7A and 19.6A, at 114°F. Class 2: replace the breakers.

03 / 09 · Backup

Transfer switches (ATS / STS)

Contacts that sit still for months, then have to carry the full load in seconds.

What we look for
Contact and termination heating on normal and emergency sides, and on static transfer switches.
From our reports Class 3 · Urgent
The A-phase connection on an automatic transfer switch at about 139°F, the hottest of the three phases. Class 3: clean and re-torque.

04 / 09 · Distribution

Switchboards & distribution

Every downstream system depends on these mains and feeders staying cool.

What we look for
Main and feeder breakers, bus connections, neutrals and phase balance.
From our reports Class 2 · As time permits
A 250A feeder breaker with A-phase at 157A and B-phase at 114A, 115°F at the connection. Class 2: replace the breaker, clean and re-torque.

05 / 09 · Conditioning

UPS systems

The bridge between utility and generator. If it fails, the bridge is gone.

What we look for
Input, output and bypass breakers, rectifier and inverter connections, and capacitor banks.
From our reports Class 2 · As time permits
A PDU feeder breaker on a UPS distribution board with two phases running warm, 104°F. Class 2: clean and re-torque.

06 / 09 · Conditioning

Battery strings

A single bad connection limits how long the whole string can carry the load.

What we look for
Intercell connectors and terminal posts in service, and under discharge during load-bank tests.
From our reports Class 1 · Normal
A UPS battery cabinet with every jar and intercell connection within a few degrees. Logged as the baseline.

07 / 09 · White space

Power distribution units

Where most of our data hall findings are written. Every rack downstream rides on these breakers.

What we look for
Transformer windings, main and branch breakers, and circuits running close to their rating.
From our reports Class 3 · Urgent
A 20A branch breaker carrying 17A at 131°F. Class 3: redistribute the load or upgrade the circuit.

08 / 09 · White space

Remote power panels

Branch breakers close to the racks, where load moves every time a customer adds gear.

What we look for
Breakers that run hot at light load (the breaker is failing, not the circuit) and overloaded branches.
From our reports Class 2 · As time permits
Three 30A breakers at about 5A each running at 110°F. Light load and still hot means the breaker is failing. Class 2: replace.

09 / 09 · White space

Overhead busway

Overhead, out of sight and loaded by the rack. Joints and tap boxes loosen over time.

What we look for
Plug-in units, tap boxes and joints along each run, under live load.
From our reports Class 1 · Normal
Plug-in unit connections on an overhead bus duct, all even and cool. Logged as the baseline.
How we scan the power path

From the field

What a data hall looks like through our cameras.

Real findings from our 2026 data center reports, cropped so no site can be identified. Each one was imaged under live load, classed 1 to 4 and handed over with a recommended fix.

See the track record
Infrared image of two 30 amp breakers in a data hall PDU panel running hot PDU PANEL · 142°F · CLASS 3
Two 30A branch breakers in a data hall PDU panel at 142°F, in a 73°F room. Recommended action: replace both breakers before they fail.
Infrared image of a remote power panel breaker running hot at light load RPP · 110°F AT 5A LOAD · CLASS 2
A 30A breaker carrying only 5A ran at 110°F. Light load and still hot means the breaker itself is failing, not the circuit. Recommended action: replace.
Infrared image of a motor control contactor on a cooling pump with one phase at 309 degrees COOLING PLANT MCC · 309°F · CLASS 4
One phase of a condenser water pump contactor at 309°F. Lose the pump and you lose cooling. Classed for immediate repair: clean and re-torque the connections.
TABLE 01 · FINDINGS LOG · 2026 DATA CENTER REPORTS · SITE NAMES REMOVED
DateStateAssetFindingClassAction
SEP 2026 TX PDU 60A branch breaker at 25.6A, failing connection 4 of 4, Immediate Clean and re-torque
SEP 2026 TX CRAH 30A feed, all three phases hot 4 of 4, Immediate Replace components
SEP 2026 TX CRAH C-phase lug hot at 15A 3 of 4, Urgent Re-crimp or replace lug
SEP 2026 TX RPP 50A branch breaker at 25.1A 3 of 4, Urgent Replace breaker
AUG 2026 TX Cooling VFD Contactor A-phase hot at 52A 4 of 4, Immediate Clean and re-torque
See more findings (16)

How it works

Built around how your site already runs.

  1. 01

    Scope

    Send a gear list, a one-line or just the address. We confirm what gets scanned, how it is opened and who supplies the electrician, then write or follow your MOP.

  2. 02

    Scan

    Level III thermographers scan energized gear under load. No outage, no shutdown window, escorted and change-controlled the way your site runs.

  3. 03

    Report

    Every component listed, every finding imaged and classed 1 to 4 with a recommended action. Formatted for NFPA 70B records, audits and insurers.

  4. 04

    Close out

    Re-scan after repairs to prove the fix, then trend each asset year over year so you can see what is getting worse before it fails.

NFPA 70BNFPA 70ENEC 110.16Level III thermographersInsurer-ready reportingNo-outage scanning

FAQ

Questions facility teams ask us

How often should a data center have an infrared scan?

At least once a year, and we recommend twice a year on critical distribution gear. NFPA 70B (2026 edition) calls for infrared thermography of electrical equipment at least every 12 months and shorter intervals when equipment condition warrants it. Most data center operators scan the full electrical path once a year. We recommend adding a mid-year scan of UPS, PDU, STS and busway, the gear closest to IT load.

Do you need an outage to scan our gear?

No. Infrared only works on energized equipment under load, so we scan live. Where covers must come off, a qualified electrician opens the gear under your MOP and NFPA 70E safe work practices. We can supply that electrician, or work alongside yours or your electrical contractor's.

Will you work under our MOP?

Yes. We work under your Method of Procedure, escort and change-control rules. If your site does not have one for infrared, we write a scan MOP for your review before the visit, covering scope, sequence, PPE, roles and back-out steps.

What does the report include?

Every inspected component is listed by location, with thermal and visual images for every finding, the measured temperature rise, a severity class from 1 (normal) to 4 (immediate action), and a recommended corrective action. The report is formatted for NFPA 70B records, insurer submissions and audits. Partners can receive it under their own brand.

What is the difference between an infrared scan and an arc flash study?

An infrared scan finds equipment that is failing now: loose connections, overloaded circuits and failing components that run hot. An arc flash study calculates how much energy a fault would release at each piece of gear, so workers know the hazard and the PPE required. NFPA 70E requires the arc flash risk assessment to be reviewed at least every five years. Most facilities need both.

How is Nines Critical related to InfraredTeam?

Nines Critical is the mission-critical division of InfraredTeam, a Texas infrared thermography firm founded in 1996. Same thermographers, same equipment and the same reporting, focused on data centers and critical power.

Next step

Tell us about your site.

Send a gear list, a one-line or just the address. We scope it with you, and you get a written scope and price, usually within one business day.